Skip to main navigation.

FIELD WORK

 

 

Intercounty has contracted Osmose to begin pole inspections in the following areas:

Licking substation                                                         January 2017

North Licking substation                                               January 2017

Dunn substation (Cabool area)                                    January 2017

Macedonia Substation (St. James area)                      February 2017

 

 

 

 

Powered by Touchstone Energy Cooperatives Logo