Industrial

EFFECTIVE
DATE:

January 1, 2013
 
AVAILABILITY:
This schedule is available to all members with three phase service with loads in excess of 600 kW, subject to the established rules and regulations of the Cooperative. 

CHARACTER OF SERVICE:
Three phase, 60 hertz, at available voltages.
NET MONTHLY
RATE:
                                         
 
Availability Charge            @    $7.00/day
 
Demand Charge             
   All kW Billing Demand   @   $5.40/KW
 
Energy Charges                                                
   First 200 kWh per kW    @    $0.057/kWh              
   Excess kWh                 @    $0.051/kWh               
 
MINIMUM CHARGE:
The minimum monthly charge shall be the highest one of the following charges:
1.       $1.00 per kVA of installed transformer capacity.

2.       The minimum monthly charge specified in the Agreement for Electric 
       Service.

3.       $3,240.00

TAXES:
The above rate shall be subject to all sales and franchise taxes levied or imposed by laws or ordinances which are incurred by the Cooperative.

BILLING DEMAND DETERMINATION:
The monthly billing demand shall be the highest of the following amounts:
 
1)     The maximum kilowatt demand established by the member for any period of fifteen (15) consecutive minutes during the month for which the bill is rendered, as indicated or recorded by a demand meter and adjusted for power factor as provided below.
 
2)          Eighty percent (80%) of the maximum kilowatt demand established by the member for any period of fifteen (15) consecutive minutes during the previous eleven (11) months, as indicated or recorded by a demand meter and adjusted for power factor as provided below.
 
3)          600 kW.

POWER FACTOR ADJUSTMENT:
Demand charges may be adjusted for members to correct for power factors lower than 90% when Cooperative deems necessary. Such adjustments will be made by increasing the measured demand 1.0% for each 1.0% by which the average power factor is less than 90% lagging.
 
DELIVERY POINT:
Unless otherwise specified in the service contract, the delivery point shall be the metering point where service is furnished at secondary voltage or the point of attachment of the Cooperative's primary line to the member's primary facilities if service is furnished at primary line voltage. The member is solely responsible for all wiring, equipment, and safe usage of electricity at and beyond the point of delivery.
 
TEMPORARY SERVICE:
Temporary service shall be in accordance with the rate schedule, except that the member shall pay, in addition to the specified rate and charges, construction and demolition costs associated with the service, less the value of material returned to stock. An advance deposit may be required of the full amount of the total estimated costs.
 
PRIMARY SERVICE:
Service may be furnished to the member at Cooperative's primary distribution voltage if requested by the member or if the member requests a voltage that is not a standard Cooperative voltage. All metering and system protective equipment will be charged to the member as part of the installation costs. The member will be responsible for all equipment on load side of the metering point(s). 
 
TERMS OF PAYMENT:
The above charges are net. Gross charges are ten percent (10%) higher. In the event payment is not made by or on the 15th day after the postmark date of the bill, the gross charges shall apply. Member will be disconnected if bill has not been paid on the disconnect date. Upon service re-connection, service fee(s) will be charged to the account.